Fire Hose Cabinets for Projects in Egypt and Saudi Arabia
Al Hamd Contracting lists fire hose cabinets among its network services. For a quotation, send the bill of quantities, drawings, cabinet and contents description, quantities and requested installation scope. Project details and connections to existing works are reviewed, then supply, installation, handover items and exclusions are clarified so offers can be compared on one defined scope.

Displayed reference logos
The displayed logos do not establish company accreditation.
Review the cabinet and contents as separate items
- Identify the intended cabinet and contents from the project documents.
- Review the location of use and network-connection boundaries.
- Separate cabinet, contents and installation items in the offer.
- Hand over the equipment and work with their information according to the agreed scope.
Review the cabinet and connection at the site
Cabinet specifications, contents, position and connection information are reviewed against project documents. System classification or requirements are not inferred from a cabinet photo or a general description. Supply and installation work should be explicitly identified in the offer.
Break down the cabinet item and its connection boundaries
Send the information available, together with the project location and requested scope. Missing information can be identified when the case is reviewed.
| Item | Information to provide |
|---|---|
| Cabinet | Dimensions, material, finish and fixing arrangement. |
| Contents | Hose, outlet, nozzle and accessories required by the project. |
| Connection | Size, connection type and network connection position. |
| Access | Door-opening space, operating space and existing obstructions. |
| Documents | Information for each component and handover requirements. |
Prepare your request and review the service scope
Use the project guide to collect the available information, then contact the team to review your request.
Examples from HTC building-systems work
The following cards show examples from the company’s building-systems project record. Each project description gives its published scope. Review similar work with the team before using a project as a reference for the service you require.
Fire hose cabinet questions
Does “fire cabinet” include the hose and all contents?
Do not assume this without a component list. Identify what is inside the cabinet and what belongs to the network or a separate bill item.
Is a hose on a reel the same as any hose inside a cabinet?
State the hose type, arrangement and components. Do not use the cabinet name instead of describing the required hose system. Connection and use information are reviewed against project documents.
Does the external material define the contents specification?
No. Material and finish are cabinet items, while hose, outlet and accessory specifications are defined separately.
We are replacing a cabinet in an existing recess. Which dimensions are needed?
Send recess dimensions, fixing method, connection position, photos of the door opening and obstructions, and details of the required cabinet and contents.
Why does the supplier need network information if we only want a cabinet?
If the request includes contents or connection work, the fittings, components and work boundaries must be identified. State enclosure-only supply explicitly rather than assuming connection work is included.
For the scope of the references, see NFPA 14. The project and competent authority determine the applicable edition and requirements.
Discuss a fire hose cabinet project
Request a site review or offer for fire hose cabinets. Send the project city, scope and available drawings or photos so the team can identify the next step.
Prepare project information · Request a review or quotation · About HTC and its services
More projects from the company record
These are company project references. Read each project scope before treating it as evidence for a specific service.