A pump sized by the calculation, not by fear.

Fire Pumps: Supply, Installation and Testing in Egypt

For contractors and facility owners: electric, diesel and jockey sets, sized to your required flow and pressure.

Request a quote on WhatsApp (opens WhatsApp in a new tab) Estimate the pump size

We reply during working hours: Sunday–Thursday 9 am–7 pm

A chat opens with a ready message; an engineer replies during working hours

  • 137 entries in the published company project register
  • All governorates of Egypt
  • Head office: Heliopolis, Cairo

137 entries in the published company project register
Head office: Heliopolis, Cairo

Fire pumps in Egypt, installed by HTC: a split-case fire pump and its discharge line with a check valve and a padlocked valve.
A vertical jockey pump between red risers and valves, with the pump controllers behind it.
A diesel-driven and an electric fire pump in one room, with the risers, valves and fuel tank.
Work completed by HTC Fire Protection

What does a fire pump set cost? The price is set by the flow, the pressure, the driver (electric or diesel) and UL/FM listing, and by whether the set includes the jockey pump and valves. Choose the flow, pressure and set components for a written, itemised quotation.

Flow
The message we receive Hello, I would like a quotation for a ___ gpm fire pump set (pressure in bar: ___ — set components: ___ — valves and fittings: ___ — preferred payment terms: ___). Governorate: ___Request ref: HTC-XXXXX
Fire pumps in Egypt, installed by HTC: a split-case fire pump and its discharge line with a check valve and a padlocked valve.

Publisher: · Publisher information updated: .

Built first, promised second

The red discharge header of an outdoor pump house: risers with check valves and gate valves, a vertical jockey pump and two controllers.
Work completed by HTC Fire Protection

Documented projects

From our register

  • Danone factory, El Obour Fire pumps, Maintenance Qalyubia 2021
  • UTOPIA Pharma, 10th of Ramadan City Fire pumps · by purchase order Sharqia 2022

Clients from our work register

  • 137 documented projects since 2010
  • 17 governorates with documented projects
  • 16 years in fire protection
  • 48 working hours to review your BOQ

From site visit to commissioning and acceptance testing

  1. Site survey
  2. Design and calculation
  3. Supply
  4. Installation
  5. Testing, commissioning and handover
  6. Periodic maintenance
More projects (4): Sea Grain, Hilton Taba, Heart Academy Hospital, SE WIRING
  • Sea Grain, El Dekheila port Fire pumps, Fire fighting, Fire alarm, Gas suppression · under contract Alexandria 2021
  • Hilton Taba Resort, dive centre Fire pumps, Fire fighting South Sinai 2014
  • Heart Academy Hospital, Abbassia Fire pumps, Fire fighting Cairo 2016
  • SE WIRING, 6th of October City Fire pumps, Fire alarm, Maintenance Giza 2021

We work in every governorate of Egypt

Shaded governorates are where we have documented projects

Request a call

We call you back during working hours: Sunday–Thursday 9 am–7 pm

Egyptian mobile, 11 digits starting with 01

Fire pumps: supply and installation, electric, diesel and jockey

  • Main fire pump (electric or diesel)
  • Jockey pump
  • Controllers
  • Valves, flow meter and test header
  • Diesel fuel tank and engine exhaust
  • Performance test at 0%, 100% and 150% of rated flow
  • Handover documents
Fire pump room: electric main pump and jockey pump

Fire pump room: electric main pump and jockey pump Illustration, not to scale · Dashed line: pressure‑sensing line

Drawing key
  1. 1 Main fire pump, horizontal split‑case
  2. 2 Electric motor (driver)
  3. 3 Jockey pump, vertical in‑line
  4. 4 Main fire pump controller
  5. 5 Jockey pump controller
  6. 6 Suction from the tank, OS&Y gate valve
  7. 7 Eccentric reducer at the suction flange, flat side up
  8. 8 Main relief valve to an open waste cone, where NFPA 20 requires it
  9. 9 Circulation relief valve, to drain
  10. 10 Discharge check valve
  11. 11 Pressure‑sensing line, one per controller, tapped between the check valve and the discharge control valve
  12. 12 Discharge control valve, OS&Y
  13. 13 Discharge header to the system
  14. 14 Test line: normally closed valve and flow meter
  15. 15 Test header with hose valves, outside the room

Value engineering: the same protection, for less where the code allows

The usual solution → Ours, by the code

We size the pump to the calculated demand and its operating point on the manufacturer's curve instead of oversizing it, and check the choice against the Egyptian Fire Protection Code (305).

The usual solution

A pump sized with a safety margin.

Ours, by the code

Sized to the hydraulically calculated demand, with the pressure checked on the manufacturer's curve at the operating point, at 150% of rated flow and at churn, and a listed pressure‑regulating device where the residual pressure at a hose connection exceeds 12 bar.

Basis Clause 2‑6‑7‑1 of part 4 of the Egyptian code

To be checked against the code in force and approved by a qualified engineer.

Fire pump prices for contractors

Contractor pricing against the same BOQ items, with the handover documents.

What you get back from the review

48 working hours Free review of a BOQ or a quotation you received — technical notes and saving opportunities, no obligation.

  • What complies Items that meet the project and the code, left as they are.
  • What exceeds the requirement What can be removed or downsized without a breach: the saving.
  • What is missing What could fail the inspection if it stays missing.
  • Which quantities need checking Quantities we ask you to check against the drawings.
Upload a BOQ file (opens WhatsApp in a new tab)

Opens WhatsApp with a ready message; send the file in the chat.

Which size do you need: a 250, 500 or 750 gpm fire pump?

Enter the hazard and the number of standpipes: the calculator works out the demand, then the size to NFPA 20, step by step.
Worked example: Hazard OH1, 2 standpipes, Sprinklered throughout, Height 20 m → 750 gpm Estimate the pump size

Hazard OH12 standpipesSprinklered throughoutHeight 20 m

Occupancy hazard (NFPA 13)

Light hazard: Offices, classrooms, hospitals

Ordinary hazard, group 1: Car parks, bakeries, laundries

Ordinary hazard, group 2: Light manufacturing, low-pile storage warehouses, workshops

Extra hazard, group 1: Printing plants, sawmills

Extra hazard, group 2: Flammable liquid spraying or flow coating, foam plastics manufacturing

0 if the building has no standpipe system.

Is the building sprinklered throughout?
In metres
Does the facility have any of the following?

Preliminary result

Worked example — change the inputs and press Calculate

Smallest acceptable size under NFPA 20
750gpm
750 × 1.5 = 1125 ≥ 752.89
Typical size
1,000gpm
Smallest NFPA 20 standard size of at least 752.89 gpm
Smallest acceptable size under NFPA 20: 750 gpm covers the demand within 150% of its rated flow (up to 1,125 gpm), where NFPA 20 still requires at least 65% of the rated pressure. It is acceptable only when the pump curve confirms the required pressure at that point and the churn stays within the system pressure limits; the typical 1,000 gpm size meets the demand at 100% of its flow.
Design demand
752.9gpm
Jockey pump — rule of thumb
10.0gpm
Water tank — shorter duration
115.5m³
30,525 gal · 60 min
Pressure required at the pump (approx.)
10.6bar
(153.4 psi)
  • Standpipe demand: Egyptian Code 305, Part 4 §2‑6‑8‑1 governs — 2,850 L/min (752.9 gpm); NFPA 14: 750 gpm.
  • Residual pressure at the most remote outlet: NFPA 14 governs as the stricter — 6.9 bar (100 psi); Egyptian Code 305, Part 4 §2‑6‑6‑2: 4.5 bar (65.3 psi).
  • Water tank: the NFPA volume governs — 115.5 m³; Egyptian Code 305, Part 1 §3‑10‑5‑11: at least 90 m³.
Calculation steps and assumptions

Assumptions

Hydraulic imbalance allowance
1.15 ×
Friction and fittings allowance
1.7 bar (25 psi)
Static head per metre
0.098 bar/m (1.42 psi/m)

Preliminary constants used by this calculator; the hydraulic calculation replaces them in the final design.

Where the standpipe values come from — NFPA 14 (2019)

  • §7.10.1.1.1 At least 500 gpm for the hydraulically most remote standpipe.
  • §7.10.1.1.3 250 gpm for each additional standpipe, in buildings with floor areas that do not exceed 7432 m² per floor.
  • §7.8.1 A residual pressure of at least 6.9 bar (100 psi) at the most remote 2½ in. hose connection.

Egyptian Fire Protection Code (305)

  • part 4, 2‑6‑8‑1 At least 1900 L/min for the hydraulically most remote standpipe and 950 L/min for each additional one, with a system total of at most 4750 L/min (floor area up to 7500 m²).
  • part 4, 2‑6‑8‑3 In a building sprinklered throughout with a combined system, the standpipe demand need not exceed 3800 L/min unless the authority (Civil Protection) requires more.
  • part 4, 2‑6‑6‑2 A residual pressure of at least 4.5 bar at the hydraulically most remote hose connection.
  • part 4, 2‑6‑7‑1 At most 12 bar residual at hose connections larger than 38 mm; above it, a listed pressure‑regulating device.
  • part 1, 3‑10‑5‑11 A wet‑riser reserve of at least 60 m³ for the first riser and 30 m³ for each other riser.

The calculator takes the larger of the Egyptian code value and the NFPA value for each item.

Preliminary estimate — to be checked against the code in force and approved by a qualified engineer.

Ask the assistant about a code clause

Your question about a clause of the Egyptian Fire Protection Code (305) and NFPA 12, 13, 14, 16, 17, 20, 72, 96 and 2001 reaches our engineer on WhatsApp.

Ask the assistant about a code clause

A chat opens with a ready message; an engineer replies during working hours

0 / 500

Enter to send · Shift + Enter for a new line

Suggested questions

Common questions before signing

What do fire pumps cost in Egypt, and what drives the price?

The flow rating alone does not set the price; the driver, the required pressure, UL/FM listing and whether the set includes the jockey pump, valves and fittings do.

We select the standard size that meets the flow and the pressure together. Size the pump above, or send the flow and pressure in bar for a written quotation.

Estimate the pump size

We are a contractor: do you price at contractor rates?

Yes, against the same BOQ items: supply, installation and testing at contractor rates, with the handover documents.

We return your BOQ with technical notes and saving opportunities within 48 working hours, free of charge.

Upload a BOQ file (opens WhatsApp in a new tab)

Will the fire pump pass the Civil Protection inspection?

The decision belongs to the Civil Protection authority, not to us or any contractor, so we do not promise it.

What we commit to: a pump to the Egyptian code and NFPA 20, a performance test at 0%, 100% and 150% of rated flow, and handover documents.

Do fire pumps in Egypt need UL listing or FM approval?

NFPA 20 requires a pump and controller listed for fire service; the usual listings are UL and FM. The listing approves the equipment, not the contractor.

We supply what the project and the authority require, no more, and state the listing in the quotation.

Request a quote on WhatsApp (opens WhatsApp in a new tab)

What are the fire pump room requirements?

A dedicated room separated by fire‑rated construction or in a separate building, easy to reach, with drainage, lighting, ventilation and heat that prevents freezing.

A diesel pump also needs a fuel tank, an exhaust to the outside and two battery sets with a charger; the authority sets the separation rating.

Fire pump room checklist (Arabic)

How many gallons per minute does my facility need, and is a 250 gpm set enough?

Flow in gallons per minute is determined by the demand: occupancy hazard, standpipes and sprinklers. Floor area alone does not determine it. A 250 gpm set may suit one facility and be insufficient for another of the same area.

Use the preliminary calculator to understand the inputs and send the result for engineering review. The final pump selection requires the project hydraulic calculation and the applicable requirements.

Do you prepare an equipment submittal for the consultant?

We agree the required submission with the project consultant. It can include the hydraulic calculation and intermediate values, proposed equipment data sheets, manufacturer listing documents where required, and a review against the project requirements.

Equipment listing relates to the tested equipment, not to the contractor. The quotation states the documents included and their delivery dates.

When is a diesel fire pump needed instead of an electric pump?

The choice must account for the required power reliability and backup arrangement. Review the electric backup supply and any liquid-fuel-driven standby provision against the applicable project requirements before selection.

An electric arrangement may be simpler where the required reliable power is available. A diesel arrangement also needs its fuel supply, exhaust and starting batteries. These provisions should be included in the compared offers.

How long do supply and installation take?

It depends on the pump, the driver, the listing required and availability, so we do not quote a general figure.

We state the time and stages in writing in the quotation after the site visit, and agree any shutdown with you first.

Do you offer maintenance contracts for pump rooms?

Yes, to NFPA 25: pump runs, the annual performance test and valve inspection, with a technical report after every visit.

The fire pump room checklist (Arabic) is free to print.

Request a fire pump quote

A ready WhatsApp message, or request a call with just your name and mobile number.

Or request a call

We call you back during working hours: Sunday–Thursday 9 am–7 pm

Enter your name and mobile

Egyptian mobile, 11 digits starting with 01

Add details or a file

Our office

73 Osman Ibn Affan St., Safir Sq., Heliopolis, Cairo, Egypt
Open in Google Maps (opens in a new tab)